PROJECT: CSTEE-0008-00 (063)
APPLING COUNTY
P. I. #0008063
Notice is hereby given in compliance with Georgia Code 22-2-109 that the Georgia Department of Transportation has approved the Location and Design of this project.
The date of location approval is 3/03/08.
The project consists of 0.07 miles of pedestrian walkways, curb & gutter and resurfacing on Park Avenue from U.S. 1/State Street to Fair Street and 0.092 miles of pedestrian walkways on Tippins Street from Dean Street to U.S. 1/State Street.
The proposed construction on Park Avenue will consist of constructing a pedestrian walkway, curb & gutter and resurfacing. The proposed construction on Tippins Street will consist of demolition of the existing pedestrian walkway on the southside and constructing a new pedestrian walkway.
Drawings or maps or the proposed project, as approved, are on file and are available for public inspection at Lyons City Hall:
City of Baxley
Jeff Baxley
282 Parker Street
Baxley, GA 31513
912-367-8300
Any written request or communication in reference to this project or notice should include the Project and P.I. Numbers as noted at the top of this notice.
5-4, 5-11, 5-18 and 5-25ch
gpn14 NOTICE OF LOCATION AND DESIGN APPROVAL
Trackbacks
Trackback specific URI for this entry
No Trackbacks
