Notice is hereby given in compliance with Georgia Code 22-2-109 and 32-3-5 that the Georgia Department of Transportation has approved the Location and Design of this project.
The date of location approval is May 20, 2011.
This project consists of the replacement of three structurally deficient two-lane bridges on US 1/SR 4 over the Altamaha River, Overflow 1 and Williams Creek. The project begins at mile post 20.48 in Appling County and ends at mile post 1.74 in Toombs County. This project is in land lots 618 and 619 and also lies within Georgia Militia District 43 and has a total length of 2.56 miles.
The proposed new bridges will be built on new alignment to the east of the existing bridges while traffic is maintained on the existing roadway. The proposer roadway typical section has two 12 ft. travel lanes with 4 ft. paved shoulders.
Drawings or maps or plats of the proposed project, as approved, are on file and are available for public inspection at the Georgia Department of Transportation:
Matthew McKenzie
Area 1 Engineer
mmckenzie@dot.ga.gov
Georgia Department of Transportation
740 Oakdale Circle
Baxley, GA 31513
(912) 366-1090
Any interested party may obtain a copy of the drawings or maps or plats or portions thereof by paying a nominal fee and requesting in writing to:
Bobby K. Hilliard, P. E.
State Program Delivery Engineer
Office of Program Delivery
bhilliard@dot.ga.gov
One Georgia Center
600 West Peachtree Street, 25th Floor
Atlanta, GA 30308
(404) 631-1122
Any written request or communication in reference to this project or notice SHOULD include the Project and P.I. Number as noted at the top of this notice.
6-1, 6-8, 6-15 & 6-22ch
gpn14 NOTICE OF LOCATION AND DESIGN APPROVAL BR000-0001-00(216), APPLING/TOOMBS COUNTIES P.I. No. 0001216
Trackbacks
Trackback specific URI for this entry
No Trackbacks
